· Structure
Ground-floor slab pour
Concrete is being poured for the ground-floor roof slab, completing the ground-floor structure of the development.

Sharhabil · Under construction
Fifteen residences. Two buildings. One address in Sharhabil, Saida.
Artist's impression. Final design may vary.
Since
2006
Kanaan Construction develops residential buildings in Lebanon and builds them with its own teams. The people who stand behind your home after handover are the same people who poured its concrete.

Now under construction
An intimate collection of fifteen residences in Sharhabil, Saida: three-bedroom homes of 147 m² and 142 m², crowned by three Roof Houses with open outlooks.
Construction standards
A building reveals its quality slowly: in walls that stay dry through winter storms, roofs that never leak, and a structure that remains sound. This is where our attention goes, long before the finishes.
Engineered by licensed structural engineers, with earthquake resistance designed in from the first drawing. Every cage of reinforcement is inspected on site before concrete is poured, and every slab is given the time it needs to cure.
Roofs, balconies, bathrooms, kitchens and below-ground walls are sealed against water and laid to precise falls, so water leaves the building instead of settling in it. Wet areas are flood-tested before a single tile is laid.
Unprotected blockwork draws in rain. Our external walls are finished to repel water, every joint is sealed, and sills are detailed to shed water clear of the facade, so the rooms inside stay dry, season after season.
Insulated external walls and roofs keep interiors cool in summer and warm in winter, reduce energy bills, and prevent the condensation that leads to mould.
Balustrades built to safe heights, earthed electrical installations protected by circuit breakers, and well-lit shared stairs and entrances. Safety is designed in, never added later.
Plumbing, electrical conduits and waterproofing are inspected before plaster, tiles or paint conceal them, because the defects that matter most begin where no one can see.
Gallery
Artist's impression. Final design may vary.
Construction
· Structure
Concrete is being poured for the ground-floor roof slab, completing the ground-floor structure of the development.
Location
Next to Houssam Eddine Hariri High School
Block A commands the street frontage. Block B is set back behind it, overlooking Houssam Eddine Hariri High School.
Street 211, Sharhabil, Saida, Lebanon · 33.57673° N, 35.40015° E
Kanaan 2
Be among the first to receive floor plans, pricing and availability for Kanaan 2. A member of our sales team will be in touch with you personally.
Our sales team answers personally. Message us on WhatsApp or call, and we will share floor plans, pricing and availability.
Email: sales@kanaan-group.co